Design check categories

Not every item of temporary works needs the same level of checking. The standard sorts them into design check categories, numbered 0 to 3.

The idea in plain English

Important

The category depends on complexity and risk, not on height alone. There is no simple height rule.

The category is decided by the Temporary Works Coordinator, with the designer, and recorded on the design brief and the design and check certificate.

[Technical reviewer to confirm all category wording against BS 5975-1:2024 before launch.]

General guidance to support a temporary works procedure. Not legal, engineering or compliance advice.